SPC charts people actually keep using
A quality manager once showed me two binders. One had 14 months of control charts, all beautifully complete. The other had charts that stopped after three weeks. Same process, same operators. The diff
A quality manager once showed me two binders. One had 14 months of control charts, all beautifully complete. The other had charts that stopped after three weeks. Same process, same operators. The diff
Most Gage R&R arguments are not about the math. They are about the study design: parts that do not span the tolerance, operators who can see the previous reading, and a report where the %GRR number wa
A capability index is a ratio: Cpk = min(USL - mean, mean - LSL) / (3 * sigma) Everything in that formula is unambiguous except sigma. Two different sigmas are in common use — the within-subgroup (sh